HPP provides crucial support from the very start of the project and is fully experienced in providing:
Site assessment, considering the possible ownership restrictions and operational aspects of the location (power / water and highways) highlighting the benefits and problems likely to be faced through the planning process.
Provision of initial site layout plans to establish the scale of operations and any associated restrictions leading to optimum site size and equipment needs to assist with initial cost budgets providing data for the overall project economic evaluation.
Identification and engagement of appropriate officials within the local authority and public domain who would be allies for the project and establish a dialogue to gauge support or identify issues to be resolved.
Preparation of EIA screening arguments to identify only the necessary planning
Manage and compile the detailed reports to prepare the planning application submission to the local authority and monitor or respond throughout the progress to a successful
conclusion.
Engage with the local population in full consultation to explain the project and process to ally any fears and promote the positives of the project in improving clean air and reducing carbon footprint.
From successful planning then assist with the preparation of detailed architectural drawings and technical input from equipment suppliers to establish a tender package for civil works and installation of equipment.
The monitoring of the planning conditions attached to the project to ensure all are complied with.